How To Fix 64902 - Planning date not maintained


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 64 - Treasury Management: Securities

  • Message number: 902

  • Message text: Planning date not maintained

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 64902 - Planning date not maintained ?
    The SAP error message "64902 - Planning date not maintained" typically occurs in the context of production planning or materials management when a planning date is required but not provided for a specific operation, order, or planning scenario. This error can prevent users from proceeding with certain transactions or processes in SAP.
    
    Cause: The error is usually caused by one of the following reasons: Missing Planning Date: The planning date has not been set for the relevant material, production order, or planning scenario.
    Configuration Issues: There may be configuration settings in the system that require a planning date but are not properly set up. Data Entry Errors: Users may have inadvertently skipped entering the planning date during the creation or modification of a document.
    Solution: To resolve the error, you can take the following steps: Check the Planning Date: Navigate to the relevant transaction (e.g., production order, material master) and check if the planning date is maintained. If it is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant