Message type: E = Error
Message class: 64 - Treasury Management: Securities
Message number: 077
Message text: Calculation date must be within the subscription right trading period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
64077
- Calculation date must be within the subscription right trading period ?The SAP error message 64077, "Calculation date must be within the subscription right trading period," typically occurs in the context of financial transactions or calculations related to subscription rights, such as options or other financial instruments. This error indicates that the date you are trying to use for a calculation falls outside the valid trading period for the subscription rights.
Cause: Invalid Date: The calculation date you entered is either before the start date or after the end date of the subscription right trading period.
Configuration Issues: There may be issues with how the subscription rights or trading periods are configured in the system. Data Entry Error: The date may have been entered incorrectly, leading to the error.
Solution: Check the Calculation Date: Verify that the calculation date you are using is indeed within the defined trading period for the subscription rights. You can do this by checking the relevant financial documents or settings in SAP. Review
Get instant SAP help. Sign up for our Free Essentials Plan.
64076
Assign depositary bank
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
64075
Final maturity date cannot be before date of notice
What causes this issue? The final maturity date (condition header): &V1& cannot be before the bond holder/issuer notice date (basic data): &a...
64078
No exchange rate could be assigned
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
64079
Calculation day has to be within the subscription period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.