Do you have any question about this error?
Message type: E = Error
Message class: 64 - Treasury Management: Securities
Message number: 069
Message text: Issue start date cannot be greater than drawing date
The issue start date (condition header): &V1& may not be greater than
the drawing date (basic data): &V2&
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
64069
- Issue start date cannot be greater than drawing date ?The SAP error message 64069, which states "Issue start date cannot be greater than drawing date," typically occurs in the context of material management or production planning within SAP. This error indicates that there is a date inconsistency in the data being processed, specifically regarding the issue start date and the drawing date.
Cause:
- Date Configuration: The issue start date is set to a date that is later than the drawing date. This can happen if the dates are not entered correctly or if there is a misunderstanding of the timeline for the process.
- Data Entry Error: Users may have mistakenly entered the wrong dates during the creation or modification of a document, such as a production order, material document, or similar.
- System Configuration: There may be configuration settings in the SAP system that enforce this rule, and if the dates do not comply with these settings, the error will be triggered.
Solution:
- Check Dates: Review the issue start date and the drawing date in the relevant document. Ensure that the issue start date is not set to a date that is later than the drawing date.
- Correct Data Entry: If you find that the dates are incorrect, update the issue start date to a date that is equal to or earlier than the drawing date.
- Consult Documentation: If you are unsure about the correct dates, consult the relevant documentation or stakeholders involved in the process to clarify the intended timeline.
- System Configuration Review: If the issue persists or if you believe the configuration may be incorrect, consult with your SAP Basis or configuration team to review the settings related to date validations.
Related Information:
CO01
(Create Production Order), MB1A
(Goods Withdrawal), or others related to material management.By following these steps, you should be able to resolve the error message 64069 and ensure that your data entries are consistent with the required date logic in SAP.
Get instant SAP help. Start your 7-day free trial now.
64068
Final maturity date cannot be before drawing date
What causes this issue? The maturity end date (condition header): &V1& cannot be before the drawing date (basic data): &V2&System Res...
64067
Drawing date & cannot be after term end
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
64070
Issue start date cannot be later than conversion period from/to
What causes this issue? The issue start date (condition header): &V1& cannot be after the conversion period from / to date (basic data): &...
64071
Issue start date cannot be after oblig.to offer for sale/right to offer
What causes this issue? The issue start date (condition header): &V1& cannot be after the obligation to offer for sale- or right to offer dat...
Click on this link to search all SAP messages.