Do you have any question about this error?
Message type: E = Error
Message class: 64 - Treasury Management: Securities
Message number: 059
Message text: Drawing date & cannot be before issue start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
64059
- Drawing date & cannot be before issue start date ?The SAP error message 64059, which states "Drawing date & cannot be before issue start date," typically occurs in the context of document management or project management within SAP, particularly when dealing with drawings or documents that have specific date constraints.
Cause:
This error arises when a user attempts to enter or save a drawing date that is earlier than the defined issue start date for that particular document or project. The issue start date is a critical parameter that establishes the timeline for when a document or drawing is valid or can be used. If the drawing date is set before this date, it violates the logical sequence of document management, leading to this error.
Solution:
To resolve this error, you can take the following steps:
Check the Issue Start Date: Verify the issue start date for the document or project in question. This can usually be found in the document management or project management module of SAP.
Adjust the Drawing Date: If the drawing date you are trying to enter is indeed before the issue start date, you will need to change the drawing date to a date that is on or after the issue start date.
Review Document Settings: Ensure that the settings for the document or drawing are correctly configured. This includes checking any related parameters that might affect the date constraints.
Consult Documentation: If you are unsure about the correct dates or how to adjust them, refer to the SAP documentation or user manuals related to document management or project management.
Seek Help from SAP Support: If the issue persists or if you believe there is a system error, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
By following these steps, you should be able to resolve the error and continue with your work in SAP.
Get instant SAP help. Start your 7-day free trial now.
64058
'Trading until' date cannot be before issue start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
64057
Date of balance payment must be later than issue start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
64060
ID number &1 is not available in exchange &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
64061
Currency entry is missing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.