Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix 62298 - Reference date refers to invalid settlement period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 62 - Message Texts for Real Estate

  • Message number: 298

  • Message text: Reference date refers to invalid settlement period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 62298 - Reference date refers to invalid settlement period ?

    The SAP error message 62298, "Reference date refers to invalid settlement period," typically occurs in the context of settlement processes in SAP, particularly in modules like Project System (PS) or Controlling (CO). This error indicates that the reference date you are trying to use for a settlement operation does not correspond to a valid settlement period in the system.

    Causes:

    1. Invalid Reference Date: The reference date you are using may not fall within an open or valid settlement period.
    2. Period Closing: The settlement period may have been closed in the system, preventing any further settlements from being processed for that period.
    3. Configuration Issues: There may be configuration settings in the controlling area or fiscal year variant that are not aligned with the reference date.
    4. Data Entry Errors: There could be a simple data entry error where the wrong date was inputted.

    Solutions:

    1. Check Settlement Periods:

      • Go to the transaction code OB52 to check the open and closed periods for your controlling area. Ensure that the reference date falls within an open period.
    2. Adjust Reference Date:

      • If the reference date is incorrect, adjust it to a valid date that falls within an open settlement period.
    3. Open the Period:

      • If necessary, you can open the period for settlement by adjusting the settings in transaction code OB52. However, be cautious with this approach, as it may affect other transactions.
    4. Review Configuration:

      • Check the configuration settings for your controlling area and fiscal year variant to ensure they are set up correctly. This can be done in the SPRO transaction under the Controlling section.
    5. Consult Documentation:

      • Review SAP documentation or help files related to settlement periods and error message 62298 for additional context and troubleshooting steps.
    6. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ88 (for project settlements) and KKAO (for internal order settlements).
    • SAP Notes: Check for any SAP Notes related to error message 62298 for specific patches or updates that may address the issue.
    • User Authorization: Ensure that you have the necessary authorizations to perform settlement operations in the system.

    By following these steps, you should be able to identify the cause of the error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker