How To Fix 61832 - No total reqs exist for material &1, plant &2, production version &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 832

  • Message text: No total reqs exist for material &1, plant &2, production version &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 61832 - No total reqs exist for material &1, plant &2, production version &3 ?

    The SAP error message 61832 indicates that there are no total requirements for a specific material, plant, and production version combination. This error typically occurs in the context of production planning and material requirements planning (MRP) when trying to create or process a production order, or when running MRP for a specific material.

    Cause:

    1. No Demand Exists: There may be no sales orders, planned orders, or other demand sources that would generate requirements for the specified material.
    2. Incorrect Production Version: The production version specified may not be valid for the material or may not be set up correctly.
    3. Material Master Settings: The material may not be set up correctly in the material master, particularly in the MRP views.
    4. Plant-Specific Settings: The plant may not have any stock or planned orders for the material, or the material may not be relevant for MRP in that plant.
    5. MRP Type: The MRP type assigned to the material may not be appropriate for generating requirements (e.g., if it is set to "ND" - No MRP).

    Solution:

    1. Check Demand: Verify if there are any sales orders, planned orders, or forecasts that would create demand for the material. If there are none, you may need to create them.
    2. Validate Production Version: Ensure that the production version specified is valid for the material and that it is correctly configured in the system.
    3. Review Material Master: Check the material master data for the material in question. Ensure that the MRP views are correctly maintained and that the material is set up for the correct plant.
    4. Check Plant Settings: Ensure that the material is relevant for MRP in the specified plant and that there are no restrictions preventing it from being included in MRP runs.
    5. Adjust MRP Type: If the MRP type is set to "ND", consider changing it to a type that allows for requirements to be generated (e.g., "PD" for MRP).
    6. Run MRP: If you have made changes, run the MRP process again to see if the requirements are generated.

    Related Information:

    • Transaction Codes: You can use transaction codes like MD04 (Stock/Requirements List) to check the current status of the material and its requirements.
    • Material Master Data: Use transaction code MM03 to view the material master data and check the MRP views.
    • Production Version: Use transaction code C223 to check and maintain production versions.
    • MRP Configuration: Review the MRP configuration settings in the system to ensure they are set up correctly for your materials and plants.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and MRP processes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author