How To Fix 61548 - The latest reqmts date must lie between the reqmts date and the plnnd end


61548 - Overview

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 548

  • Message text: The latest reqmts date must lie between the reqmts date and the plnnd end

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


61548 - Details

  • The SAP error message 61548, "The latest reqmts date must lie between the reqmts date and the plnnd end," typically occurs in the context of production planning or material requirements planning (MRP) when there is an inconsistency in the dates specified for a particular requirement or planning scenario.
    
    Cause: This error arises when the latest requirements date (the date by which the materials or products are needed) is not within the range defined by the requirements date (the date when the requirement is created) and the planned end date (the date when the production or planning is expected to conclude). Specifically, the latest requirements date must be greater than or equal to the requirements date and less than or equal to the planned end date.
    Solution: To resolve this error, you can take the following steps: Check Dates: Review the requirements date and planned end date for the relevant production order, sales order, or planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


61548 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant