Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 337
Message text: Sales order planning/project planning not possible for material &1 &2
You want to execute sales order planning or project planning for
material &V1& plant &V2&. Requirements totaling is activated for this
material in the repetitive manufacturing profile. The system does not
support sales order planning or project planning for materials with MRP
total requirements.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Execute single-level or multilevel planning for this material or plan
the material within the total planning run.
Error message extract from SAP system. Copyright SAP SE.
61337
- Sales order planning/project planning not possible for material &1 &2 ?The SAP error message 61337 indicates that sales order planning or project planning is not possible for a specific material. This error typically arises in the context of production planning and control, particularly when dealing with sales orders or project-related materials.
Cause: The error can occur due to several reasons, including: Material Master Settings: The material may not be set up correctly in the material master. For example, it might not have the necessary planning views activated (like MRP views). Sales Order Configuration: The sales order may not be configured correctly, or the material may not be allowed for sales order planning. Availability Check: The system may not be able to perform an availability check for the material due to missing data or incorrect settings. Project Definition: If the error is related to project planning, the project definition may not be set up correctly, or the material may not be assigned to the project. Status of the
Get instant SAP help. Sign up for our Free Essentials Plan.
61336
Several main parts in discontinuation group &1
What causes this issue? An error occurred during BOM explosion for material &V2&. The BOM with usage &V3& alternative &V4& co...
61335
BOM is not valid: &1, &2, &3, &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61338
Single item planning in simultation mode not possible for material &1 &2
What causes this issue? You want to plan material &V1& plant &V2& within multilevel single-item planning. This material is part of a ...
61339
Time stamp problem: Changes to planned order '&1' terminated
What causes this issue? The changes to planned order &V1& were terminated. The cause of the termination is the presence of differences with r...
Click on this link to search all SAP messages.