Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 269
Message text: Column with rescheduling date shown
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61269
- Column with rescheduling date shown ?The SAP error message 61269 typically relates to issues with scheduling in the context of production planning or project management. This error indicates that there is a problem with the rescheduling of dates for a particular operation or task. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Inconsistent Dates: The rescheduling date may not align with the planned dates or may be outside the permissible range.
- Dependencies: There may be dependencies or constraints that prevent the rescheduling of the operation.
- Resource Availability: The resources required for the operation may not be available on the new rescheduled date.
- Configuration Issues: There may be configuration settings in the system that are not allowing the rescheduling to occur.
Solution:
- Check Dates: Review the planned and actual dates for the operation. Ensure that the rescheduling date is valid and within the acceptable range.
- Review Dependencies: Check for any dependencies or constraints that might be affecting the scheduling. This includes checking for predecessor and successor tasks.
- Resource Allocation: Ensure that the necessary resources (machines, labor, etc.) are available on the new rescheduling date.
- Configuration Review: If the issue persists, review the configuration settings in the SAP system related to scheduling and rescheduling. This may involve consulting with a system administrator or SAP consultant.
- Use Transaction Codes: Utilize relevant transaction codes (like CO02 for changing production orders) to make necessary adjustments.
- Consult Documentation: Refer to SAP documentation or help files for specific guidance on error message 61269.
Related Information:
If the problem continues after trying the above solutions, it may be beneficial to escalate the issue to your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
61268
Please check the selection parameters
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61267
Project &1 is not an account assignment element
What causes this issue? The WBS element &V1& is not able to be assigned to an account. It therefore cannot be copied into the order as an acc...
61270
***** COMMENT: Messages for missing table entries
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61271
MRP controller '&1' for material '&2' does not exist
What causes this issue? In material &V2&, an MRP controller &V1& is entered that is not included in the MRP controller table.System R...
Click on this link to search all SAP messages.