Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 260
Message text: Project and/or WBS element not complete
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61260
- Project and/or WBS element not complete ?The SAP error message 61260, which states "Project and/or WBS element not complete," typically occurs when you are trying to perform an action related to a project or Work Breakdown Structure (WBS) element that has not been fully defined or is missing required information. This error is common in project management modules within SAP, such as SAP Project System (PS).
Causes:
- Incomplete Project Definition: The project or WBS element may not have all the necessary details filled out, such as dates, status, or other mandatory fields.
- Missing Master Data: Required master data (like cost centers, internal orders, or activity types) may not be assigned or may be incomplete.
- Status Issues: The project or WBS element may be in a status that does not allow certain actions (e.g., "Not Released").
- Hierarchy Issues: The WBS element may not be properly linked to its parent project or may be missing in the project hierarchy.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the project or WBS element.
Solutions:
- Check Project/WBS Element Details: Go to the project or WBS element in question and ensure that all required fields are filled out correctly. This includes checking the project definition, dates, and any other mandatory information.
- Review Master Data: Ensure that all necessary master data is correctly assigned to the project or WBS element. This may include checking cost centers, internal orders, and activity types.
- Check Project Status: Verify the status of the project or WBS element. If it is not released, you may need to release it to perform certain actions.
- Validate Hierarchy: Ensure that the WBS element is correctly linked to its parent project and that the hierarchy is intact.
- Authorization Check: Confirm that you have the necessary authorizations to access and modify the project or WBS element. If not, contact your SAP administrator for assistance.
Related Information:
CJ20N
(Project Builder) or CJ03
(Display Project) to view and edit project details.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP Project System.
Get instant SAP help. Start your 7-day free trial now.
61259
Material requires configuration
What causes this issue? Orders and requirements for a configurable material must have characteristic values. Usually, you should create a variation f...
61258
Configured BOM could not be exploded
What causes this issue? The system could not determine any configuration data for the requirement for this configurable BOM.System Response The syst...
61261
Project does not allow individual project production
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61262
Project and/or WBS element does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.