How To Fix 61216 - Stge loc. does not correspond to the stge loc. of the scheduling agmt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 216

  • Message text: Stge loc. does not correspond to the stge loc. of the scheduling agmt

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 61216 - Stge loc. does not correspond to the stge loc. of the scheduling agmt ?

    The SAP error message 61216, which states "Stge loc. does not correspond to the stge loc. of the scheduling agmt," typically occurs in the context of logistics and supply chain management, particularly when dealing with scheduling agreements and stock management.

    Cause:

    This error usually arises when there is a mismatch between the storage location specified in the document (like a purchase order or scheduling agreement) and the storage location defined in the scheduling agreement itself. The system expects the storage location in the document to match the one defined in the scheduling agreement, and if they do not match, this error is triggered.

    Solution:

    To resolve this error, you can follow these steps:

    1. Check the Scheduling Agreement:

      • Go to the scheduling agreement in question and verify the storage location defined there. You can do this by navigating to the relevant transaction (e.g., ME33L for display scheduling agreement).
      • Ensure that the storage location is correctly set up and corresponds to the intended location for the goods.
    2. Verify the Document:

      • Check the document (e.g., purchase order or delivery) that is causing the error. Ensure that the storage location specified in this document matches the storage location in the scheduling agreement.
      • If there is a discrepancy, you may need to change the storage location in the document to match the one in the scheduling agreement.
    3. Adjust the Configuration:

      • If the storage location needs to be changed frequently, consider reviewing the configuration settings in the system to ensure that they align with your business processes.
    4. Consult with Your Team:

      • If you are unsure about the correct storage location or how to proceed, consult with your logistics or procurement team to ensure that the correct locations are being used.
    5. Recreate the Document:

      • In some cases, if the document is incorrect and cannot be modified, you may need to delete it and recreate it with the correct storage location.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as ME33L (Display Scheduling Agreement), ME21N (Create Purchase Order), and ME22N (Change Purchase Order).
    • Master Data: Ensure that the material master data and vendor master data are correctly maintained, as these can also affect the storage location settings.
    • User Authorizations: Ensure that you have the necessary authorizations to make changes to the scheduling agreement or related documents.

    By following these steps, you should be able to resolve the error message 61216 in SAP. If the issue persists, consider reaching out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker