How To Fix 61181 - Material component is a planned receipt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 181

  • Message text: Material component is a planned receipt

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 61181 - Material component is a planned receipt ?

    The SAP error message 61181, "Material component is a planned receipt," typically occurs in the context of production planning and material requirements planning (MRP). This error indicates that the system is trying to use a material component that is not available for consumption because it is still in the planning stage and has not yet been received or produced.

    Cause:

    1. Planned Receipts: The material component in question is marked as a planned receipt in the system, meaning it is expected to be received in the future but is not currently available in stock.
    2. Production Orders: This error often arises when trying to confirm a production order or when attempting to allocate materials for production that are not physically available.
    3. MRP Settings: The MRP settings may not be configured correctly, leading to discrepancies between planned and actual stock levels.

    Solution:

    1. Check Stock Levels: Verify the stock levels of the material component in question. You can do this using transaction codes like MMBE (Stock Overview) to see if the material is indeed a planned receipt.
    2. Adjust Production Orders: If you are trying to confirm a production order, ensure that all required components are available. You may need to adjust the production schedule or the order itself.
    3. Review MRP Settings: Check the MRP settings for the material. Ensure that the planning parameters are set correctly and that the material is not incorrectly marked as a planned receipt.
    4. Convert Planned Receipts: If the planned receipt is expected to be delivered soon, you may want to wait until it arrives. Alternatively, if you have the ability to expedite the receipt, you can do so.
    5. Use Alternative Materials: If the planned receipt is not expected soon, consider using alternative materials that are available in stock for the production process.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04 (Stock/Requirements List) to analyze the situation further.
    • Material Master Data: Review the material master data for the component to ensure that all relevant information is accurate and up to date.
    • Production Planning: Understanding the production planning process and how MRP works in SAP can help prevent similar issues in the future.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message, as there may be specific fixes or recommendations provided by SAP.

    By following these steps, you should be able to resolve the error message 61181 and ensure that your production processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages: