Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 142
Message text: Finish date of a procurement proposal outside the factory calendar
When creating an order proposal, the finish date cannot be determined.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The finish date would lie outwith the factory calendar.The planning of the material would be terminated.
Check the factory calendar and the in-house production time or the
planned delivery time of the material.
Error message extract from SAP system. Copyright SAP SE.
61142
- Finish date of a procurement proposal outside the factory calendar ?The SAP error message 61142 indicates that the finish date of a procurement proposal falls outside the defined factory calendar. This typically occurs when the planned or proposed dates for production or procurement do not align with the working days defined in the factory calendar, which can lead to scheduling issues.
Cause:
- Factory Calendar Configuration: The factory calendar may not include the date specified in the procurement proposal, possibly due to holidays, weekends, or other non-working days.
- Incorrect Date Entry: The finish date may have been entered incorrectly, leading to a date that is not valid according to the factory calendar.
- Lead Time Issues: The lead times defined for procurement or production may not account for the non-working days, causing the finish date to fall outside the allowed range.
Solution:
- Check Factory Calendar: Verify the factory calendar settings in SAP to ensure that the relevant dates are included. You can do this by navigating to the transaction code
SCAL
(Factory Calendar) and reviewing the calendar settings.- Adjust Dates: If the finish date is incorrect, adjust the procurement proposal to a valid date that falls within the factory calendar. This can be done in the relevant transaction (e.g.,
MD04
for stock/requirements list).- Review Lead Times: Check the lead times associated with the procurement proposal. Ensure that they are set correctly and take into account the factory calendar.
- Re-schedule: If the procurement proposal is based on a production order or a planned order, consider re-scheduling the order to align with the factory calendar.
Related Information:
MD04
(Stock/Requirements List), MD01
(MRP Run), and SCAL
(Factory Calendar).By addressing the above points, you should be able to resolve the error message 61142 and ensure that procurement proposals align with the factory calendar.
Get instant SAP help. Start your 7-day free trial now.
61141
Material cannot be processed with this transaction
What causes this issue? The material you would like to plan using the MRP run has been defined as a master schedule item. You can only plan master sc...
61140
No planning file entry exists for this selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61143
Account assignment category & invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61144
Purchase requisition has not yet been released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.