Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 139
Message text: Requirements planning is not active in plant &
The basic requirement for carrying out the planning run is that MRP has
been activated via customizing for the plant for which you want to run
the planning program.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Aktivate MRP via customizing for MRP by choosing
<DS:SIMG.SIMG_CFMENUOPP1OMDU>Activate MRP and set up planning file</>.
If you do not have the necessary authorization to do this, notify your
system administrator.
Error message extract from SAP system. Copyright SAP SE.
61139
- Requirements planning is not active in plant & ?The SAP error message 61139, "Requirements planning is not active in plant &," indicates that the requirements planning functionality is not enabled for the specified plant in your SAP system. This can occur in various scenarios, such as when trying to create or modify a material, or when running MRP (Material Requirements Planning) processes.
Cause:
- MRP Not Activated: The plant in question does not have MRP activated in its configuration.
- Plant Settings: The plant settings may not be properly configured to allow for requirements planning.
- Material Master Data: The material master data for the specific plant may not be set up correctly, particularly in the MRP views.
Solution:
To resolve this error, you can follow these steps:
Check MRP Configuration:
- Go to the transaction code
SPRO
to access the SAP Customizing Implementation Guide.- Navigate to Logistics > Production > Material Requirements Planning > MRP Areas.
- Ensure that the MRP area for the plant is defined and that MRP is activated.
Activate MRP for the Plant:
- In the same configuration area, check if the plant is set up for MRP. You may need to activate MRP for the plant if it is not already done.
Review Material Master Data:
- Use transaction code
MM03
to display the material master data.- Check the MRP views (e.g., MRP 1, MRP 2) for the specific plant to ensure that the MRP type is set correctly (e.g., PD for MRP).
- Ensure that the relevant fields are filled out correctly, such as the MRP controller and planning strategy.
Check Plant-Specific Settings:
- Ensure that the plant is correctly assigned to the company code and that all necessary settings are in place.
Consult Documentation:
- If you are unsure about the settings, refer to SAP documentation or consult with your SAP Basis or functional team for assistance.
Related Information:
MM03
: Display Material MasterSPRO
: Customizing Implementation GuideMD01
: MRP RunBy following these steps, you should be able to resolve the error message 61139 and enable requirements planning for the specified plant. If the issue persists, further investigation into system logs or consulting with SAP support may be necessary.
Get instant SAP help. Start your 7-day free trial now.
61138
Plant & has not been maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61137
The blocking entry for plant & was deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61140
No planning file entry exists for this selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61141
Material cannot be processed with this transaction
What causes this issue? The material you would like to plan using the MRP run has been defined as a master schedule item. You can only plan master sc...
Click on this link to search all SAP messages.