Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 022
Message text: The requirements date lies after the planned finish date on time axis
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61022
- The requirements date lies after the planned finish date on time axis ?The SAP error message 61022, which states "The requirements date lies after the planned finish date on time axis," typically occurs in the context of production planning or material requirements planning (MRP). This error indicates that there is a mismatch between the date when a requirement is expected to be fulfilled and the planned finish date of the production order or process.
Cause:
- Incorrect Planning Dates: The requirements date (when materials or products are needed) is set later than the planned finish date of the production order. This can happen due to incorrect data entry or planning parameters.
- Scheduling Issues: The scheduling of production orders may not align with the requirements, leading to a situation where the required materials or products are needed after the production is scheduled to be completed.
- Changes in Demand: If there are changes in customer demand or order quantities that are not reflected in the production schedule, it can lead to this error.
- Lead Time Miscalculations: If the lead times for procurement or production are not accurately defined, it can result in requirements being scheduled incorrectly.
Solution:
- Review Dates: Check the requirements date and the planned finish date in the production order or MRP. Ensure that the requirements date is set to a date that is on or before the planned finish date.
- Adjust Production Schedule: If necessary, adjust the production schedule to ensure that it aligns with the requirements. This may involve rescheduling production orders or changing the planned finish dates.
- Update MRP Parameters: Review and update MRP parameters, such as lead times, to ensure they accurately reflect the production and procurement processes.
- Check for Changes in Demand: If there have been changes in customer orders or demand, update the production plan accordingly to reflect these changes.
- Consult with Stakeholders: Collaborate with relevant departments (e.g., sales, production, and logistics) to ensure that everyone is aligned on the requirements and production schedules.
Related Information:
By addressing the underlying causes and ensuring that the planning dates are aligned, you can resolve the error message 61022 and improve the efficiency of your production planning processes.
Get instant SAP help. Start your 7-day free trial now.
61021
A requirement quantity of zero is not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61020
No scheduling information exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61023
A calculation of the number of partial lots is not possible
What causes this issue? The relationship between the total order quantity and the partial lot quantity is incorrect.System Response The system can c...
61024
A calculation of the total quantity is not possible
What causes this issue? The values in fields <LS>partial lot quantity</> and <LS>number of partial lots</> are multiplied to ...
Click on this link to search all SAP messages.