How To Fix 61022 - The requirements date lies after the planned finish date on time axis


61022 - Overview

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 022

  • Message text: The requirements date lies after the planned finish date on time axis

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 61022 - The requirements date lies after the planned finish date on time axis ?
    The SAP error message 61022, which states "The requirements date lies after the planned finish date on time axis," typically occurs in the context of production planning or material requirements planning (MRP). This error indicates that there is a mismatch between the date when a requirement is expected to be fulfilled and the planned finish date of the production order or process.
    
    Cause: Incorrect Planning Dates: The requirements date (when materials or products are needed) is set later than the planned finish date of the production order. This can happen due to incorrect data entry or planning parameters. Scheduling Issues: The scheduling of production orders may not align with the requirements, leading to a situation where the required materials or products are needed after the production is scheduled to be completed. Changes in Demand: If there are changes in customer demand or order quantities that are not reflected in the production schedule, it can

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant