Do you have any question about this error?
Message type: E = Error
Message class: 5Z - IS-HR/PSG Public Sector Payroll - Germany
Message number: 486
Message text: Period and child component proposed with reason and child increase amount
The automatic default settings are activated. If applicable, the system
suggests values for the <LS>validity period</> and for the <LS>Child
Component
</>, <LS>Reason</>, and <LS>Child Increas. Amt</> fields. For more
information on automatic default settings, see the documentation for
feature <DS:HRDS.DSYSLO_ECI549B_DOF02AAAAAAAAAAAAAAA___0VVV>DOF02</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
5Z486
- Period and child component proposed with reason and child increase amount ?The SAP error message 5Z486 typically relates to issues in the context of project management or controlling, particularly when dealing with budget planning or cost management. This error message indicates that there is a discrepancy between the proposed period and the child component's increase amount, which can occur during budget planning or when adjusting costs in a project.
Cause:
- Budget Overrun: The proposed increase in the budget for a specific period exceeds the allowable limits set for the child component.
- Configuration Issues: There may be configuration settings in the project or controlling area that do not align with the proposed changes.
- Data Entry Errors: Incorrect data entry when proposing changes to the budget or costs can lead to this error.
- Hierarchy Issues: The relationship between parent and child components may not be correctly defined, leading to inconsistencies in budget proposals.
Solution:
- Review Proposed Changes: Check the proposed increase amount and ensure it aligns with the budget limits for the child component.
- Adjust Budget Settings: If necessary, adjust the budget settings or limits for the child component to accommodate the proposed changes.
- Correct Data Entry: Verify that all data entries are correct and consistent with the project’s budget and cost structure.
- Check Hierarchy: Ensure that the hierarchy between parent and child components is correctly defined and that the relationships are properly set up in the system.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling budget proposals and adjustments.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP project management and controlling.
Get instant SAP help. Start your 7-day free trial now.
5Z485
Module variant &1 is not permitted for module ORTSZ
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
5Z484
System attempted to divide by zero
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
5Z487
Entry does not exist in pay scale groups table (T510)
What causes this issue? The selected entry does not exist in table T510 (<LS>Pay Scale Groups</> ). Using country grouping &V1& (...
5Z488
Entry does not exist in payroll parameters table (T511K)
What causes this issue? The selected entry does not exist in table T511K (<LS>Payroll Parameters </>). Using country grouping &V1&...
Click on this link to search all SAP messages.