How To Fix 5B520 - Start date is after end date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 5B -

  • Message number: 520

  • Message text: Start date is after end date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 5B520 - Start date is after end date ?

    The SAP error message 5B520 indicates that there is a problem with the date range specified in a transaction or configuration. Specifically, it means that the start date you have entered is after the end date, which is logically incorrect.

    Cause:

    This error typically occurs in scenarios where date ranges are required, such as:

    • Creating or modifying a project or task in Project System (PS).
    • Setting validity periods for master data (like materials, vendors, etc.).
    • Scheduling activities in production planning or other modules.

    Solution:

    To resolve the error, you need to ensure that the start date is earlier than the end date. Here are the steps you can take:

    1. Check the Dates: Review the start and end dates you have entered. Make sure that the start date is indeed before the end date.

    2. Correct the Dates: If you find that the start date is after the end date, correct it by entering a valid start date that is earlier than the end date.

    3. Validation: After making the changes, validate the entries to ensure that the error does not reoccur.

    4. Consult Documentation: If you are unsure about the correct date ranges, refer to the relevant SAP documentation or guidelines for the specific module you are working with.

    5. User Input: If the dates are being input by users, consider implementing validation checks in the user interface to prevent this error from occurring in the future.

    Related Information:

    • Transaction Codes: Depending on the context of the error, you may be working in various transaction codes (e.g., CJ20N for project management, ME21N for purchasing, etc.).
    • SAP Notes: Check SAP Notes for any known issues or patches related to the specific module you are working with.
    • User Training: Ensure that users are trained on how to correctly enter date ranges to avoid this error in the future.

    By following these steps, you should be able to resolve the error message 5B520 and proceed with your SAP activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant