Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: 53 - Incentive Wages Data
Message number: 089
Message text: Overflow during target value calculation
The calculated target value is too high.
The system rejects the entries.
Check the base quantity, confirmed quantity and all default values
and units.
Error message extract from SAP system. Copyright SAP SE.
53089
- Overflow during target value calculation ?The SAP error message 53089, "Overflow during target value calculation," typically occurs in the context of planning or forecasting processes within SAP systems, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that a calculation has exceeded the maximum limit that can be handled by the system, often due to large numbers or incorrect data inputs.
Causes:
- Large Data Values: The target value being calculated may be too large, leading to an overflow. This can happen if the input data contains unusually high values.
- Incorrect Configuration: Misconfiguration in planning parameters or settings can lead to calculations that exceed the system's limits.
- Data Quality Issues: Inaccurate or corrupted data in the master data or transaction data can lead to unexpected results during calculations.
- Mathematical Operations: Certain mathematical operations (like multiplication of large numbers) can lead to overflow if the resulting value exceeds the data type limits.
Solutions:
- Review Input Data: Check the input data for any unusually high values that could be causing the overflow. Correct any data quality issues.
- Adjust Planning Parameters: Review and adjust the planning parameters or settings to ensure they are configured correctly and are within reasonable limits.
- Data Type Review: Ensure that the data types used for calculations are appropriate for the expected range of values. If necessary, consider changing the data type to one that can handle larger values.
- Error Handling: Implement error handling in your planning processes to catch and manage potential overflows before they cause issues.
- Consult Documentation: Refer to SAP documentation or notes related to the specific module you are using for any known issues or patches that may address this error.
- Contact SAP Support: If the issue persists, consider reaching out to SAP support for assistance, especially if it appears to be a bug or a system limitation.
Related Information:
By addressing the underlying causes and implementing the suggested solutions, you can resolve the overflow error and improve the stability of your planning processes in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
53088
Time tickets for group &1 cannot be entered in period
What causes this issue? The period from &v2& to &v3& is outside of the validity period for the group.System Response The system does...
53087
Time tickets for group &1 cannot be entered for entire period
What causes this issue? The validity period of group &v1& only partially falls within the period which extends from &v2& to &v3&a...
53090
Number range object &1 was not created
What causes this issue? The number range for time events does not exist.System Response The time events of cluster B1 cannot be converted.How to fix...
53091
Interval &2 was not created for number range object &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.