Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 069
Message text: No link between resources in operation &1 and &2
You want to release or schedule operation &V1&.
The resource in operation &V1& is not linked to the resource of the
preceeding or subsequent operation &V2& in the resoruce network of the
header.
Change the resource used for operation &V1&.
Error message extract from SAP system. Copyright SAP SE.
40069
- No link between resources in operation &1 and &2 ?The SAP error message "40069 No link between resources in operation &1 and &2" typically occurs in the context of production planning or project management within SAP. This error indicates that there is no defined relationship or link between the resources assigned to two different operations in a routing or production order.
Cause:
- Missing Resource Assignment: The resources (e.g., machines, labor) assigned to the operations do not have a defined relationship in the routing or production order.
- Incorrect Routing: The routing may not be set up correctly, leading to a lack of connection between the operations.
- Resource Configuration: The resources may not be configured properly in the system, or they may not be compatible with the operations.
- Order Status: The production order or project may be in a status that does not allow for the linking of resources.
Solution:
- Check Routing: Review the routing for the production order or project. Ensure that the operations are correctly defined and that the resources are properly assigned.
- Define Links: If necessary, define the links between the resources in the operations. This can be done in the routing or by adjusting the production order.
- Resource Configuration: Verify that the resources are correctly configured in the system. Check for any missing settings or parameters that may prevent linking.
- Reassign Resources: If the resources are not compatible, consider reassigning them to ensure that they can be linked appropriately.
- Order Status: Ensure that the production order or project is in a status that allows for changes to be made. If it is locked or completed, you may need to change its status before making adjustments.
Related Information:
CO02
(Change Production Order) or CA01
(Create Routing) to make the necessary adjustments.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning or project management within SAP.
Get instant SAP help. Start your 7-day free trial now.
40068
No control instructions/recipes yet generated for order &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
40067
Resource &1 in operation &2 does not meet resource selection conditions
What causes this issue? You want to plan or release operation &V2&.System Response Selection criteria are available for resource &V1&...
40070
Unable to generate list of control instructions/recipes for order &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
40071
&2 resources selected for operation &1. Proposal: &3
What causes this issue? You want to plan or release operation &V1&.System Response The current resource of this operation is not allowed. Th...
Click on this link to search all SAP messages.