Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 647
Message text: EC management only supported for BOM maintenance with validity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
29647
- EC management only supported for BOM maintenance with validity ?The SAP error message 29647, which states "EC management only supported for BOM maintenance with validity," typically occurs in the context of Bill of Materials (BOM) management when trying to perform Engineering Change Management (ECM) operations on a BOM that does not have validity dates set.
Cause:
The error arises because the Engineering Change Management functionality in SAP requires that the BOM has validity periods defined. This means that the BOM must have a start date and an end date (or an indefinite end date) to manage changes effectively. If these validity dates are not set, the system cannot process the ECM operations, leading to this error message.
Solution:
To resolve this error, you need to ensure that the BOM you are trying to work with has the necessary validity dates defined. Here are the steps to do this:
Access the BOM Maintenance Transaction:
- Use transaction code
CS02
(Change BOM) orCS01
(Create BOM) in SAP.Select the BOM:
- Enter the relevant material number and plant to access the BOM in question.
Set Validity Dates:
- In the BOM header, look for the fields related to validity dates (e.g., Valid From and Valid To).
- Set the "Valid From" date to the date when the BOM should become effective.
- Optionally, set the "Valid To" date if you want to specify an end date for the BOM's validity.
Save the Changes:
- After entering the validity dates, save the BOM.
Retry the ECM Operation:
- Once the BOM has the validity dates set, you can retry the Engineering Change Management operation that previously resulted in the error.
Related Information:
By ensuring that BOMs have the appropriate validity dates, you can effectively utilize the Engineering Change Management features in SAP without encountering this error.
Get instant SAP help. Start your 7-day free trial now.
29646
Sort not supported for field &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
29645
Material type & not supported for BOM headers with usage &
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
29648
Enter at least one "x"
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
29649
No multiple BOM exists for &/&/&
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.