Message type: E = Error
Message class: 29 - Bills of Material
Message number: 073
Message text: BOM can only be extended via standard product &
You want to extend the BOM for a material.
The material is a configured material. The BOM for the configured
material was configured from the BOM for configurable material &V1&.
The BOM of the configured material can only be extended by extending
the BOM of configurable material &V1&.
Check whether the alternative concerned has been created for the
configurable material.
If required, allocate the BOM of the configured material to the
alternative concerned (<LS>Material BOM -> Alloc. config. mat. ->
Create</>).
Error message extract from SAP system. Copyright SAP SE.
29073
- BOM can only be extended via standard product & ?The SAP error message 29073, which states "BOM can only be extended via standard product &," typically occurs when you are trying to extend a Bill of Materials (BOM) for a product that is not classified as a standard product in the system. This error is often encountered in the context of SAP's Product Lifecycle Management (PLM) or when managing BOMs in the SAP ERP system.
Cause: Product Type: The product you are trying to extend the BOM for is not defined as a standard product in the system. In SAP, certain product types have restrictions on how BOMs can be managed. Configuration Settings: The system configuration may restrict the extension of BOMs for non-standard products. Master Data Issues: There may be issues with the master data of the product, such as missing classifications or incorrect settings.
Solution: Check Product Type: Verify that the product you are trying to extend the BOM for is indeed a
Get instant SAP help. Sign up for our Free Essentials Plan.
29072
Material & is not configurable
What causes this issue? You want to create or change the BOM for material &V1&, and one of the following situations triggered this error mess...
29071
Last bill of material
What causes this issue? You want to create a variant for the BOM for the material you entered (variante BOM). The BOM is maintained via date. However...
29074
BOM can only be changed via standard product &
What causes this issue? You want to change the BOM for a material. This material is a configured material. The BOM for the selected material was conf...
29075
Material & & is configured from standard product &
What causes this issue? You want to create a BOM for material &V1& in plant &V2&. This material is a configured material. The BOM for...
Click on this link to search all SAP messages.