How To Fix 1P890 - Error during processing of planned items


1P890 - Overview

  • Message type: E = Error

  • Message class: 1P - BCA: Payment Transactions

  • Message number: 890

  • Message text: Error during processing of planned items

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 1P890 - Error during processing of planned items ?
    The SAP error message 1P890, which indicates "Error during processing of planned items," typically occurs in the context of production planning or materials management when there is an issue with the processing of planned orders or materials. Here are some common causes, potential solutions, and related information for this error:
    Causes:
    
    Data Inconsistencies: There may be inconsistencies in the master data, such as material master records, BOMs (Bill of Materials), or routing information.
    Missing or Incorrect Configuration: The configuration settings for the planning process may be incorrect or incomplete.
    Capacity Issues: There may be capacity constraints in the production resources, leading to an inability to process planned orders.
    Locked Objects: The planned items may be locked by another process or user, preventing their processing.
    Invalid Parameters: The parameters used in the planning run may be invalid or not set up correctly.
    
    Solutions:
    
    Check Master Data: Verify the material master, BOM, and routing data for accuracy and completeness. Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker