Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix 1N094 - Reporting Amt and Curr conversion failed for planned item: &1


1N094 - Overview

  • Message type: E = Error

  • Message class: 1N - BCA: Payment Item Dialog

  • Message number: 094

  • Message text: Reporting Amt and Curr conversion failed for planned item: &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


1N094 - Details

  • The SAP error message 1N094 indicates that there was a failure in the reporting amount and currency conversion for a planned item. This typically occurs in the context of financial planning and reporting, where the system is unable to convert the planned amounts into the required currency for reporting purposes.
    Causes:
    
    Missing Exchange Rates: The most common cause is that the required exchange rates for the currencies involved are not maintained in the system.
    Incorrect Currency Settings: The currency settings for the planning item may be incorrect or not aligned with the expected currency conversion settings.
    Data Inconsistencies: There may be inconsistencies in the data, such as missing or incorrect entries in the planning tables.
    
    Configuration Issues: There could be issues with the configuration of the currency conversion settings in the SAP system. Time Period Issues: The exchange rates may not be valid for the time period in which the planned item is being reported. Solutions: Check Exchange

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


1N094 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker