How To Fix 1L046 - Limit interval must be completely within validity period of IC hierarchy.


1L046 - Overview

  • Message type: E = Error

  • Message class: 1L - BKK: Limite

  • Message number: 046

  • Message text: Limit interval must be completely within validity period of IC hierarchy.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 1L046 - Limit interval must be completely within validity period of IC hierarchy. ?
    The SAP error message 1L046 ("Limit interval must be completely within validity period of IC hierarchy") typically occurs in the context of Intercompany (IC) processes, particularly when dealing with the configuration of intercompany hierarchies and their validity periods.
    
    Cause: This error arises when you are trying to define a limit interval (such as a budget or a financial limit) that does not fall entirely within the validity period of the intercompany hierarchy. In other words, the start and end dates of the limit interval must be completely contained within the start and end dates of the hierarchy's validity period.
    Solution: To resolve this error, you can take the following steps: Check the Validity Period of the IC Hierarchy: Navigate to the configuration settings for the intercompany hierarchy in SAP. Verify the start and end dates of the hierarchy's validity period. Adjust the Limit Interval: Ensure that the limit interval you are trying to set is entirely within the validity

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant