Do you have any question about this error?
Message type: E = Error
Message class: 13PS - Store dummy messages for Payment Summary to cater PA LOG
Message number: 605
Message text: &1&2&3&4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
13PS605
- &1&2&3&4 ?The SAP error message 13PS605 typically indicates an issue related to the planning or scheduling of production orders, particularly in the context of capacity planning or resource allocation. The message may include placeholders like
&1
,&2
,&3
, and&4
, which are replaced with specific details relevant to the error encountered.Cause:
The error can arise from several potential issues, including but not limited to:
- Capacity Overload: The planned production exceeds the available capacity of the resources (work centers, machines, etc.).
- Incorrect Master Data: Issues with the master data for materials, work centers, or routing can lead to scheduling conflicts.
- Scheduling Conflicts: Overlapping production orders or maintenance activities that prevent the scheduling of new orders.
- Resource Availability: Resources may not be available due to maintenance, holidays, or other scheduling constraints.
Solution:
To resolve the error, consider the following steps:
- Check Capacity: Review the capacity of the relevant work centers to ensure they can handle the planned production. Adjust the production plan if necessary.
- Review Master Data: Ensure that all master data (materials, work centers, routing) is correctly set up and reflects the current operational capabilities.
- Adjust Scheduling: If there are scheduling conflicts, try rescheduling the production orders or adjusting the maintenance plans to free up resources.
- Use Capacity Planning Tools: Utilize SAP's capacity planning tools to analyze and optimize resource allocation.
- Consult Logs: Check the system logs for more detailed information about the error, which may provide additional context for troubleshooting.
Related Information:
CM01
(Capacity Planning), COHV
(Mass Processing of Production Orders), and MD04
(Stock/Requirements List) to analyze and manage production orders and capacity.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
13PS604
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS603
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS606
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS607
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.