Do you have any question about this error?
Message type: E = Error
Message class: 13PS - Store dummy messages for Payment Summary to cater PA LOG
Message number: 300
Message text:
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
13PS300
- ?The SAP error message 13PS300 typically relates to issues in the Project System (PS) module, particularly concerning the assignment of a project or network to a controlling area or the configuration of project-related data. The specific error message can vary based on the context, but it generally indicates that there is a problem with the project structure or its integration with other modules.
Cause:
- Incorrect Project Structure: The project or network may not be correctly structured or may be missing required components.
- Controlling Area Issues: The project may not be assigned to the correct controlling area, or there may be inconsistencies in the controlling area settings.
- Master Data Issues: Missing or incorrect master data related to the project, such as cost centers, internal orders, or WBS elements.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the project data.
Solution:
- Check Project Structure: Review the project or network structure to ensure that all required components are in place and correctly configured.
- Verify Controlling Area Assignment: Ensure that the project is assigned to the correct controlling area and that the controlling area settings are consistent with the project requirements.
- Review Master Data: Check the master data associated with the project, including cost centers, internal orders, and WBS elements, to ensure they are correctly defined and active.
- Authorization Check: Verify that the user has the necessary authorizations to access and modify the project data. If not, contact your SAP security administrator to request the appropriate access.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its context.
Related Information:
Always ensure to back up any critical data before making changes in the SAP system.
Get instant SAP help. Start your 7-day free trial now.
13PS000
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13I106
Cheque payment date should be mentioned only for the Cheque option.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS301
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS302
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.