How To Fix V5010 - Die Regel & hat als Basisdatum das Vertragsende bzw. Vertragsbeginn


SAP Error Message - Details

  • Message type: E = Error

  • Message class: V5 - Contract processing

  • Message number: 010

  • Message text: Die Regel & hat als Basisdatum das Vertragsende bzw. Vertragsbeginn

  • Show details Hide details
  • Was verursacht dieses Problem?

    The system tried to determine the contract start date according to the
    rule and found that the contract start date has been defined as the
    baseline date. This is not allowed.

    Systemantwort

    The system does not permit any further processing until the contract
    start rule is maintained with a valid value.

    Wie behebe ich diesen Fehler?

    DEFINE &FELDNAME& = 'Contract start rule'
    INCLUDE 'NA_POSSIBLE_ENTRY' OBJECT DOKU ID TX LANGUAGE E
    When choosing a value, please be careful that it is not based on the
    baseline date.
    If you cannot find a rule that suits your needs, fill in the contract
    start date manually.
    If you must use a rule for indirect date determination, you can create
    the necessary rule in Customizing. If you do not have the authorization
    to do so, contact your system administrator.

    <ds:TRAN.VOVL>Proceed</>
    ENDIF

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler V5010 - Die Regel & hat als Basisdatum das Vertragsende bzw. Vertragsbeginn ?





Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author