How To Fix V4330 - Einteilung für &1 in Werk &2 wurde nicht bestätigt.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: V4 - Nachrichten Verkauf (Variable Meldungen und EDI-Meldungen)

  • Message number: 330

  • Message text: Einteilung für &1 in Werk &2 wurde nicht bestätigt.

  • Show details Hide details
  • Was verursacht dieses Problem?

    A schedule line for material &V1& in plant &V2& is not confirmed. This
    can be due to one of the following causes:
    There was a date shift because of the delivery scheduling.
    During the update of a confirmation for a sales scheduling agreement
    item, a delivery was scheduled for the schedule lines to be updated.
    Here the material availability date is determined from the requested
    delivery date in backward scheduling. If, as a result of scheduling, the
    system finds a date that is in the past, the system switches to forward
    scheduling, possibly from the current date. Schedule lines are created
    in the results. The schedule lines are different from those that
    originate from the APO system.
    The assignment of schedule line categories to the sales document item
    type is incorrect.
    To confirm all schedule lines when updating the sales documents, it is
    necessary that the schedule lines that are relevant for delivery or MRP
    are assigned to the item category of the sales document.

    Systemantwort

    The system terminates the processing, because a delivery schedule for a
    scheduling agreement can only be created if the schedule lines are
    confirmed according to the appointments and quantities transferred.

    Wie behebe ich diesen Fehler?

    Check the following system settings:
    In transaction <DS:TRAN.OVLY>OVLY</> (Sales Documents: Types -
    Scheduling) check whether the "Backward Scheduling Only" indicator is
    set for the type of sales document to be updated. If not, set the
    indicator, and start the transfer from the APO system again.
    In transaction <DS:TRAN.VOV5>VOV5
    </>(Assign Schedule Line Categories), check whether the correct schedule
    line categories are assigned to the type of sales document items to be
    transferred. If not, assign the correct schedudule line categories, and
    start the transfer from the APO system again.

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler V4330 - Einteilung für &1 in Werk &2 wurde nicht bestätigt. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.