How To Fix U7036 - Der Abrechnungsauftrag zum Datum &1 kann nicht abgerechnet werden


U7036 - Overview

  • Message type: E = Error

  • Message class: U7 - Japan-Specific Developments

  • Message number: 036

  • Message text: Der Abrechnungsauftrag zum Datum &1 kann nicht abgerechnet werden

  • Show details Hide details
  • Was verursacht dieses Problem?

    You tried to bill the billing order for the installation &V2&
    <ZH>without</> registers for &V1&. This is not possible because the
    <ZH>start of the billing period &V3&</> for the installation is after
    its <ZH>end</>.
    Note:
    Please note that the <ZH>end of the billing period</> for an
    installation <ZH>without</> registers is determined as follows,
    depending on the <DS:DE.BP>billing period</> chosen:
    Standard SBP: end of billing period = scheduled meter reading date &V4&
    Non-standard JBP: end of billing period = scheduled meter reading date
    &V4& - 1.

    Systemantwort

    Billing was cancelled.

    Wie behebe ich diesen Fehler?

    Check your settings for scheduling and for suppressing billing orders.
    Check whether the billing order needs to be billed (is the billing
    period too short?). If not, reverse it.
    Contact SAP if you are unable to solve the problem yourself.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


U7036 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker