Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 154
Message text: Zuordnungsdatum muß kleiner oder gleich &1 gewählt werden
The specified limiting date corresponds to the target reading date. It
is calculated by subtracting the interval between meter reading and the
end of the meter reading period from the end of the meter reading
period. This ensures that there is a suitable limitation for demand
billing.
Error message
Specify an allocation date for meter reading that is not later than the
specified limiting date.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
Get instant SAP help. Sign up for our Free Essentials Plan.
TU153 Bei Eingabe einer Fabrikkal.-ID müssen Sie auch 'Korr. NWerktag' pflegen
Was verursacht dieses Problem? If there is an entry in the 'Factory cal.ID' field there must also be an entry in the 'Corr. holiday&...
TU152 Die Portion &1 wird in Ableseeinheiten verwendet
Was verursacht dieses Problem? You have changed entries in a portion that is used in one or more meter reading units. This may lead to inconsistent...
TU155 Karenz 'Abl.bis AblPerEnd' von &1 auf zulässigen Wert &2 geändert
Was verursacht dieses Problem? In the meter reading dates the end of the meter reading period was changed to a date that is after the original date...
TU156 Die Ableseeinheit &1 wird noch in Anlagen verwendet
Was verursacht dieses Problem? The meter reading unit you wish to delete is still used in installtions. Deletion is therefore not permitted. To det...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.