Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 078
Message text: Abschlagsplan nicht anlegbar für Vertrag &1 (Periodenende &2 (Portion&3))
A period for the budget billing plan is determined using the move-in
date or the entry date. In structuring the the budget billing plan it
was determined that no further open due dates can be requested (end of
period already reached). For this reason no budget billing plan created
for this period.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
Please select a current period by changing the date. The current period
for this contract can be determined using the portion.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
TU078
- Abschlagsplan nicht anlegbar für Vertrag &1 (Periodenende &2 (Portion&3)) ?Get instant SAP help. Start your 7-day free trial now.
TU077
Tabellenparameter &1 des Funktionsbausteins &2 nicht gefüllt
Was verursacht dieses Problem? The table parameter for the function module has not been filled. One table must be filled (at least with contracts) ...
TU076
Zum Datum existieren bereits alle APläne für alle Verträge des Kunden &1
Was verursacht dieses Problem? No contract was found for the customer for which a budget billing plan could be created using this selection date. D...
TU079
Generieren Sie zuerst die Terminsätze der Portion
Was verursacht dieses Problem? Schedule records for meter reading units can only be generated if schedule records have been generated for the corre...
TU080
Ende AblPeriode (&2) von &1 nur &3 Tag(e) vor Ende der AbrPeriode &4
Was verursacht dieses Problem? The end of the meter reading period of the meter reading unit is only a few days before the end of the billing perio...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.