How To Fix TRQ0082 - Bewegung mit NominalBtr. &1 kann nicht in &2 Lots am &3 für &4 aufteilbar


SAP Error Message - Details

  • Message type: E = Error

  • Message class: TRQ0 - Messages for TR Quantity Ledger

  • Message number: 082

  • Message text: Bewegung mit NominalBtr. &1 kann nicht in &2 Lots am &3 für &4 aufteilbar

  • Show details Hide details
  • Was verursacht dieses Problem?

    A flow from a class position that decreases the quantity must be split
    among multiple lots when single position management is applied. In cases
    where the nominal amount of the flow is too small, it is not possible to
    split that amount among lots.
    For example, when single position management is applied for an ABS/MBS
    position, the redemption with nominal amount 0.01 USD would be split
    among available lots. However, the nominal amount is too small to be
    split by the system. Further, this redemption is not realistic.
    This relates to the position characterized by the following details:
    <ZH>&v4&</>
    INCLUDE DIFF_VALUE_DESCRIPTION OBJECT DOKU ID TX

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Systemantwort

    Wie behebe ich diesen Fehler?

    Check the position on key date &v3& for &v4& using the
    <DS:TRAN.TPM26> Position List for Quantity Ledger Positions</>
    function.
    Ensure that the nominal amount of the flow that decreases the quantity
    is big enough to be split among the available lots.
    If necessary, process the manual adjustment so to make sure the nominal
    amount is big enough to be split among lots.
    Alternatively, in Customizing for the relevant product type and company
    code, apply the CM period (APLAN) to restrict the update period of the
    cash flows. This can help to avoid very small nominal amounts after long
    terms in the future. The system ignores the CM period during
    amortization calculation, accruals/deferrals, or other calculations of
    present values for which the entire cash flow is required. When the CM
    period is applied, you <ZH>must</> always execute a planned record
    update before key date valuation or accrual/deferral execution.

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler TRQ0082 - Bewegung mit NominalBtr. &1 kann nicht in &2 Lots am &3 für &4 aufteilbar ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker