How To Fix T4191 - Korrekturdatum muss zw. Laufzeitbeginn (exklusiv) &1 und -ende &2 liegen


T4191 - Overview

  • Message type: E = Error

  • Message class: T4 - Time deposit processing

  • Message number: 191

  • Message text: Korrekturdatum muss zw. Laufzeitbeginn (exklusiv) &1 und -ende &2 liegen

  • Show details Hide details
  • Was verursacht dieses Problem?

    Correction date should be between the start of term (exclusive of start
    date) and the end of term (inclusive of end date), which are maintained
    in the previous activity. For example, if the previous activity was a
    fiduciary adjustment, then the adjustment date becomes the start of term
    for the previous activity. So the correction date should be greater than
    the adjustment date and prior, or equal, to the end of term date.
    Similarly, if the previous activity was a correction, then the current
    correction date should be greater than the previous activity start date
    (which is the correction date) and prior, or equal to, the end of term
    date.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


T4191 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author