How To Fix RU440 - Fehler bei Istzeitermittlung


RU440 - Overview

  • Message type: E = Error

  • Message class: RU - Messages for order completion confirmation

  • Message number: 440

  • Message text: Fehler bei Istzeitermittlung

  • Show details Hide details
  • Systemantwort

    With breakpoint-, partially completed and final confirmations the
    actual time is calculated for the confirmation interval thereby
    completed. Here an error has occurred.

    Wie behebe ich diesen Fehler?

    You should check whether one of the following points could have
    triggered the error:

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    No shift sequence was assigned to the work center.
    No available capacity was defined for capacity entered in the work
    center for scheduling.
    The factory calendar has not been maintained for the current calendar
    year.
    The reporting time lies before 01.01.1970.
    The work center entered does not exist.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


RU440 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker