Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix RU087 - Keine Istkosten für Netzplan & (Bitte Protokoll beachten)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RU - Messages for order completion confirmation

  • Message number: 087

  • Message text: Keine Istkosten für Netzplan & (Bitte Protokoll beachten)

  • Show details Hide details
  • Was verursacht dieses Problem?

    The actual costs could not be determined correctly due to incorrect or
    insufficient data.

    Systemantwort

    The determination of actual costs is terminated.
    However, the confirmation itself can be saved. Error records are
    written for a later determination of actual costs. Using these error
    records the determination of actual costs can be repeated once the
    original causes of the errors have been removed.

    Wie behebe ich diesen Fehler?

    You can find the exact cause of the termination of the determination of
    actual costs in the error log for actual cost determination.
    You can switch the error log on and off using the variable parameters.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler RU087 - Keine Istkosten für Netzplan & (Bitte Protokoll beachten) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant