Do you have any question about this error?
Message type: E = Error
Message class: RI - Projects: commercial reporting
Message number: 109
Message text: Zu dem Kokrs & ist kein Ergebnisbereich zugeordnet
The project/WBS element &V2& is assigned to controlling area &V1&.
However, controlling area &V1& is not assigned to an operating concern.
The checks could not be made.
Assign controlling area &V1& to an operating concern, or make the
checks omitting the settlement rule check.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
RI109
- Zu dem Kokrs & ist kein Ergebnisbereich zugeordnet ?Get instant SAP help. Start your 7-day free trial now.
RI108
& geprüft: Inkonsistenzen festgestellt
Was verursacht dieses Problem? &V1& was checked in accordance with the settings entered. Inconsistencies were found. There may also be inf...
RI107
& geprüft: Fehler festgestellt
Was verursacht dieses Problem? &V1& (and connected objects) was checked in accordance with the settings entered. Errors and inconsistencie...
RI110
Prüfungen beendet -> Siehe Protokoll
Was verursacht dieses Problem? The checks have been completed successfully. The result of the check is stored as a log.Systemantwort Das System ...
RI111
& & &
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.