Do you have any question about this error?
Message type: E = Error
Message class: REMICL - Texts for Migration of Classic RE => RE-FX
Message number: 150
Message text: Wirtsch.Berechnung &1:Gültigkeit der Aufw.Pos. &2 unzulässig
Validity period &V3& of expense item &V2& of the current expenses is
partly or completely outside of the validity period of cost efficiency
analysis &V1&.
This situation was allowed in Classic RE, but leads to an error in the
migrated dataset.
In Classic RE, perform a comparison of the validity periods. Note that
the validity period of the cost efficiency analysis must lie within the
validity period of the higher-level cost efficiency analysis.
You can change this message in the <DS><DS:SIMG.SIMG_CFMENUORK3OBA5>
Change Message Control</></> IMG activity. If the message is issued as a
warning message, then the legacy data check is not designated as
incorrect and the migration process is therefore not interrupted. The
inconsistency then has to be corrected during the data conversion by
adjusting the validity period to that of the assigned cost efficiency
analysis.
If the validity period of the expense item is completely outside the
validity period of the cost efficiency analysis, then a correction is
not possible. In that case, the message control has no effect.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
REMICL150
- Wirtsch.Berechnung &1:Gültigkeit der Aufw.Pos. &2 unzulässig ?Get instant SAP help. Start your 7-day free trial now.
REMICL149
Gültigkeit der Wirtschaftlichkeitsberechnung &1 unzulässig
Was verursacht dieses Problem? Validity period &V2& of additional cost efficiency analysis &V1& must be within the validity period ...
REMICL148
Es wurden bereits Anpassungen aktiviert
Was verursacht dieses Problem? There are prestage adjustments in the system that were already activated as adjustments.Systemantwort In the migra...
REMICL151
Keine Prüfung für &1 &2
Was verursacht dieses Problem? This message appears because it was activated using <DS:SIMG.SIMG_CFMENUORK3OBA5>message control</>.Syst...
REMICL152
Für &2 Verträge existieren &1 Verteilungen - es erfolgt keine Umsetzung
Was verursacht dieses Problem? The program found that distributions were defined for conditions of Real Estate general contracts in Classic RE. Thi...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.