Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: QA - QM : Inspection lots
Message number: 194
Message text: Die zu fertigende Menge des Auftrags ist 0
The quantity to be produced is 0. In order to process the inspection
lot any further, the quantity to be produced cannot be zero.
The system stops all further processing of the inspection lot.
Enter a quantity in the production order that is greater than zero, or
select a different production order.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
QA194
- Die zu fertigende Menge des Auftrags ist 0 ?Get instant SAP help. Sign up for our Free Essentials Plan.
QA193
Der Auftrag enthält keine Positionen
Was verursacht dieses Problem? Although the production order is available in the system it does not contain any items.Systemantwort The system pr...
QA192
Dem Auftrag ist kein Material zugeordnet
Was verursacht dieses Problem? No material has been assigned to the production order you selected. In order to process the inspection lot any furth...
QA195
Es wurde bereits ein Arbeitsplan über den Auftrag zugeordnet
Was verursacht dieses Problem? You want to use the inspection lot to carry out an inspection during production with a routing. However, a routing h...
QA196
Das Datum liegt nach dem definierten Ende des Fabrikkalenders
Was verursacht dieses Problem? You entered a date that is outside the defined factory calendar. Das System gibt eine Fehlermeldung aus und erlaubt ...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.