Message type: E = Error
Message class: PSZ1 - PS Payment Planning: Function Group KPP_PSZ
Message number: 006
Message text: Das PSP-Element &2 ist nicht Finanzkreis &1 zugeordnet
WBS element &V2& is not assigned to company code &V3&. The company code
is not assigned to FM area &V1&. Joint planning in manual payment
planning is only possible for WBS elements which are assigned to the
same FM area.
The FM area regarded by the system as valid is the FM area from the WBS
element selected first from the interval or group.
The system selects only the WBS elements assgined to FM area &V1&. If
no WBS element is so assigned by way of the company code, processing
stops.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
PSZ1006
- Das PSP-Element &2 ist nicht Finanzkreis &1 zugeordnet ?Get instant SAP help. Start your 7-day free trial now.
PSZ1005
Das PSP-Element &1 ist ungültig
Was verursacht dieses Problem? WBS element &V1& does not exist or is not assigned to controlling area &V2&.Systemantwort INCLUDE ...
PSZ1004
Die eingegebene PSP-Elementgruppe enthält keine gültigen Einträge
Was verursacht dieses Problem? Using the specified selection criteria, the system could not find any WBS element assigned to controlling area &...
PSZ1007
Das PSP-Element &1 ist keinem Finanzkreis zugeordnet
Was verursacht dieses Problem? WBS element &V1& is assigned to company code &V2&. This company code is not assgined to an FM area.S...
PSZ1008
Beachten Sie das Fehlerprotokoll
Was verursacht dieses Problem? An error has occurred.Systemantwort INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TXWie behebe ich diesen Fehler? ...