How To Fix PSZ1006 - Das PSP-Element &2 ist nicht Finanzkreis &1 zugeordnet


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSZ1 - PS Payment Planning: Function Group KPP_PSZ

  • Message number: 006

  • Message text: Das PSP-Element &2 ist nicht Finanzkreis &1 zugeordnet

  • Show details Hide details
  • Was verursacht dieses Problem?

    WBS element &V2& is not assigned to company code &V3&. The company code
    is not assigned to FM area &V1&. Joint planning in manual payment
    planning is only possible for WBS elements which are assigned to the
    same FM area.
    The FM area regarded by the system as valid is the FM area from the WBS
    element selected first from the interval or group.

    Systemantwort

    The system selects only the WBS elements assgined to FM area &V1&. If
    no WBS element is so assigned by way of the company code, processing
    stops.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler PSZ1006 - Das PSP-Element &2 ist nicht Finanzkreis &1 zugeordnet ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author