How To Fix PSSC_NET187 - Nettoberechnungsbeleg &1 (ObjectID) hat kein zugeord. Fälligkeitsdatum


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSSC_NET - Net Calculation

  • Message number: 187

  • Message text: Nettoberechnungsbeleg &1 (ObjectID) hat kein zugeord. Fälligkeitsdatum

  • Show details Hide details
  • Was verursacht dieses Problem?

    No due date is assigned to the
    <DS:GLOS.49A5F736876A4422E10000000A421392>net calculation document</>
    &V1& (ObjectID).

    Systemantwort

    The system does not execute the
    <DS:GLOS.49A5BAE5A2B21546E10000000A421392>net calculation</>.

    Wie behebe ich diesen Fehler?

    Contact your system administrator.

    Vorgehensweise für Systemadministratoren

    Check if this problem has been caused by a customer-specific adjustment.
    If this is not the case, contact SAP and specify net calculation
    document <LS>ObjectID</>.
    The net calculation document which caused the problem has the
    <LS>ObjectID </>&V1&.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler PSSC_NET187 - Nettoberechnungsbeleg &1 (ObjectID) hat kein zugeord. Fälligkeitsdatum ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant