How To Fix PPH_MRP146 - Planung mit Prognosebedarf in MRP Live on HANA nicht unterstützt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_MRP -

  • Message number: 146

  • Message text: Planung mit Prognosebedarf in MRP Live on HANA nicht unterstützt

  • Show details Hide details
  • Was verursacht dieses Problem?

    A forecast exists for the material and the forecast requirements are to
    be considered in the planning run. However, the MRP Live on HANA run
    does not support the planning of forecast requirements.
    Note:
    Do not confuse forecast requirements with planned independent
    requirements. MRP Live on HANA supports the planning of planned
    independent requirements. With regard to forecasts, MRP Live on HANA
    supports the following scenarios:
    Execution of a forecast for the total consumption. The forecast itself
    is not relevant to planning but can be used as the basis for planned
    independent requirements which are included in the MRP Live on HANA run.
    Execution of a forecast for the calculation of the reorder point and
    safety stock for consumption-based planning.

    Systemantwort

    The MRP Live report plans the material using classic MRP.

    Wie behebe ich diesen Fehler?

    The planning run using classic MRP may be slower than the planning run
    using MRP Live on HANA. To enable the planning of the material in MRP
    Live on HANA, proceed as follows:
    Check whether the material was included in a forecast recently. If the
    material was only included in forecasts in the past for which forecast
    requirements still exist, they will prevent the material from being
    included in the MRP Live on HANA run. In this case, delete the forecasts
    or select an MRP procedure that does not take account of the forecast.
    If the forecast is executed for the total consumption and included in
    the planning run (for example, for the MRP procedure ?VV?), you can
    define a similar process by setting the planning strategy group ?10?
    (make-to-stock) in the material master and selecting an MRP procedure
    that enables the execution of the forecast for the total consumption
    whereby the forecast is not relevant to planning. Then you can use the
    forecast as the basis for planned independent requirements which can be
    included in the MRP Live on HANA run.

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler PPH_MRP146 - Planung mit Prognosebedarf in MRP Live on HANA nicht unterstützt ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author