Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix PPC0043 - Fertigungsleistungen werden neu bestimmt


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPC0 - Messages for PP Confirmation

  • Message number: 043

  • Message text: Fertigungsleistungen werden neu bestimmt

  • Show details Hide details
  • Was verursacht dieses Problem?

    The <ZK>Production Activities</> screen has been accessed before. The
    production activities are determined again because of subsequent changes
    to quantities (quantity, unit of measure or cancellation indicator) or
    because of changes to key information for the reporting points to be
    confirmed. Changes that were made to production activities before and
    unplanned production activities are lost.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Check the production activities again and, if necessary, change or add
    data for the production activities before saving the confirmation.

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler PPC0043 - Fertigungsleistungen werden neu bestimmt ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author