How To Fix PK079 - Sie müssen einen Lieferplan für diesen Prozess angeben


PK079 - Overview

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 079

  • Message text: Sie müssen einen Lieferplan für diesen Prozess angeben

  • Show details Hide details
  • Was verursacht dieses Problem?

    You selected the replenshment strategy, "external procurement with
    KANBAN control/MRP" without "separate goods receipt". With this
    replenishment strategy, the planning run creates schedule lines for the
    material which the vendor uses for information purposes to plan future
    production. The schedule line is then released manually in KANBAN (by
    setting the kanban to EMPTY). When setting a kanban to FULL with this
    replenishment strategy, the system automatically posts a goods receipt
    to the scheduling agreement. Before this is possible, you must have
    recorded the scheduling agreement in the control cycle.

    Systemantwort

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Wie behebe ich diesen Fehler?

    Specify a scheduling agreement.
    If the goods receipt to the scheduling agreement is not to be posted
    automatically when setting the kanban status to FULL, set the
    indicator, "Separate GR".

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


PK079 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker