Do you have any question about this error?
Message type: E = Error
Message class: PEP - Schedule Manager: Messages
Message number: 233
Message text: Der Nachfolgerknoten vom Knoten NODE_ID = & ist in anderer Aufgabengruppe
One of the tasks in the task group refers to a subsequent task
that does not appear in the same task group. This is not
possible.
Technical information: All tasks with the same PARENT_ID belong to the
same task group and are connected
to one another in a chain. The content of the
NSIBLING_ID field refers to the
NODE_ID node of the next task in the chain.
If the task that is referred to is located in another task group (that
is, it has a different PARENT_ID),
the task list is faulty.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
PEP233
- Der Nachfolgerknoten vom Knoten NODE_ID = & ist in anderer Aufgabengruppe ?Get instant SAP help. Start your 7-day free trial now.
PEP232
Der Nachfolgerknoten vom Knoten NODE_ID = & wurde nicht gefunden
Was verursacht dieses Problem? One of the tasks refers to a subsequent task that does not exist. This is not possible. Technical information: All t...
PEP231
Die Knoten NODE_ID = &1 und &2 beenden beide die Aufgabengruppe
Was verursacht dieses Problem? One of the task groups has more than one final task. This is not possible. Technical information: All tasks with the...
PEP234
In der Aufgabengruppe des Knotens NODE_ID = & tritt eine Schleife auf
Was verursacht dieses Problem? One of the tasks in the task group refers to a subsequent task that refers back to the original task, possibly sever...
PEP235
Knoten NODE_ID = &1 und &2 haben beide keinen Vorgängerknoten
Was verursacht dieses Problem? There are at least two nodes without predecessor nodes. This is not possible. Technical information: Within a task g...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.