How To Fix ORB502 - Die Abrechnungsparameter können nicht geändert werden


SAP Error Message - Details

  • Message type: E = Error

  • Message class: ORB - Project-Related Incoming Orders/Open Orders

  • Message number: 502

  • Message text: Die Abrechnungsparameter können nicht geändert werden

  • Show details Hide details
  • Was verursacht dieses Problem?

    Settlement profile &V2& is assigned to the current object. However, the
    system determined profile &V1& from the strategy for generating the
    settlement rule.

    Systemantwort

    The desired change is not made because the object has already been
    settled.

    Wie behebe ich diesen Fehler?

    To be able to change the settlement profile retrospectively, you must
    cancel all the settlement runs for the relevant object.
    You can change the allocation structure and the PA transfer structure
    in the settlement rule from master data maintenance, without having to
    carry out a cancellation first.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler ORB502 - Die Abrechnungsparameter können nicht geändert werden ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author