Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: ORB - Project-Related Incoming Orders/Open Orders
Message number: 107
Message text: Die Hierarchie-Ebene der FaktStruktur ist nicht konsistent gepflegt
The determination of the characteristices "New order" and "Order
cancellation" for the history characteristic can be made either for the
whole project or for an individual billing element. Within a project,
this billing structure hierarchy level must be identical for all
billing elements.
The object is not processed.
Check the settings in the IMG. Make sure that the billing structure
hierarchy level within a project is identical for all the results
analysis keys used in the project.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
Get instant SAP help. Sign up for our Free Essentials Plan.
ORB106 Für PSP-Element &1 wurde kein Abgrenzungsschlüssel gepflegt
Was verursacht dieses Problem? It is the results analysis key defined in the master data which determines how the incoming order value is determine...
ORB105 Für Kostenart &1 wurde keine Zuordnung zu einer AE-Kostenart gepflegt
Was verursacht dieses Problem? Incoming order values are recorded under separate incoming order cost elements (cost element category 50 to 52). To ...
ORB108 Abgerechnete Auftragseingangswerte in Folgeperioden
Was verursacht dieses Problem? You have already settled the incoming order values for the current object to a subsequent period. A new calculation ...
ORB109 Für die Verarbeitung wird die vollständige Hierarchie benötigt
Was verursacht dieses Problem? In the settings for results analysis key &V1&, you have stipulated that the incoming order categories "...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.