Do you have any question about this error?
Message type: E = Error
Message class: ORB - Project-Related Incoming Orders/Open Orders
Message number: 103
Message text: Objekt wird nicht bearbeitet
The object could not be processed in the determination of the incoming
order value.
Possible causes:
No results analysis key maintained for the object.
A results analysis key has been maintained, but not project-based
incoming order settings have been maintained for it in the Project
System IMG.
The status of the object prohibits determination of the incoming order
value.
The indicator "Billing structure level" is not maintained consistently
in the results analysis key.
Generally speaking, more detailed information on the cause of the error
can be obtained from the earlier messages.
The object, along with any billing structures beneath it, is not
processed.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
ORB103
- Objekt wird nicht bearbeitet ?Get instant SAP help. Start your 7-day free trial now.
ORB102
Objekt trägt nicht den geforderten Status &1
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
ORB101
Es wurden keine Stammdaten ermittelt
Was verursacht dieses Problem? No master data could be determined for this selection.Systemantwort INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID ...
ORB104
Auftrags-Bestand auf herausgeprüftem Objekt ist nicht ausgeglichen
Was verursacht dieses Problem? The current object could not be processed. The open order value could not be leveled and shows the following balance...
ORB105
Für Kostenart &1 wurde keine Zuordnung zu einer AE-Kostenart gepflegt
Was verursacht dieses Problem? Incoming order values are recorded under separate incoming order cost elements (cost element category 50 to 52). To ...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.