How To Fix O1069 - Kontrakt-Mengenplan & & & ist nicht vorhanden (Pos. &).


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 069

  • Message text: Kontrakt-Mengenplan & & & ist nicht vorhanden (Pos. &).

  • Show details Hide details
  • Was verursacht dieses Problem?

    Every <DS:GLOS.release order>call-off</> has to be assigned to a
    contract in the quantity schedule. The cause of this problem could be
    that the contract quantity schedule was manually deleted after the
    call-off in the quantity schedule was created in the system.

    Systemantwort

    Error, access to the call-off quantity schedule is not allowed.

    Wie behebe ich diesen Fehler?

    Check if document &V1& &V2& &V3& is a <DS:GLOS.contract>contract</>.
    <DS:DE.VBTYP>Sales document category</>
    <DS:DE.BSTYP>Purchasing document category</>
    Go to contract document maintenance and create a new quantity schedule
    to gain access to the call-off quantity schedule.
    &reference&
    <DS:DE.OIA_SMENGE>Reference documents</>

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler O1069 - Kontrakt-Mengenplan & & & ist nicht vorhanden (Pos. &). ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker