Message type: E = Error
Message class: O1 - IS-Oil : Message pool exchanges
Message number: 018
Message text: Datum & & außerhalb Bereich &-&
While maintaining documents, if quantities have already been called,
you get an error message, otherwise you get a warning. Within the
Qty.Sched. you get an error message.
Take one of the following steps (depending on the number 1-4 of the
problem which comes up):
1. Enter a valid scheduling date or do not execute the function
'split line' or delete scheduling line.
2. Maintain/check the assigned Qty.schedule manually or semi-
automatically depending on the document type ("QS permitted"
indicator).
If the new "valid from" is before the qty.schedule: Check the first
scheduling period and insert a new scheduling period to keep the QS
consistent (avoid error <DS:NA.O1094>message O1094</>) for call-offs
with a delivery date.
If the new "valid from" is later than the QS: Check the first
scheduling period and delete the lines not already called off. If they
are already called off, it is not possible to delete the line and it is
not possible to change the "valid from" range to a later date.
If the new "valid to" is before the QS: Check the latest scheduling
lines and delete lines if possible (not already called off), otherwise
it is not possible to change the "valid to" to an earlier date.
If the new "valid to" is later than the QS: Check the last scheduling
period and insert a later sched.line if necessary (otherwise the last
scheduling period will contain a greater range of days).
3. Enter a valid range within the validity of the contract and use the
function "Restructure" if necessary after entering the valid range of
the QS.
4. Execute points 2 and 3 (delivery date change is not possible).
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
O1018
- Datum & & außerhalb Bereich &-& ?Get instant SAP help. Start your 7-day free trial now.
O1017
Datum & ist kein gültiger Arbeitstag (Kalend. &) -> &
Was verursacht dieses Problem? In <DS:GLOS.factory calendar>factory calendar</> &v2& the date &v1& is not a valid workd...
O1016
Datumsintervall & - & ist ungültig (& &).
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
O1019
Datum & ungültig f. Einteilungsperioden, Überschneidung
Was verursacht dieses Problem? You entered schedule lines which have the same scheduling date.Systemantwort When you copy lines in the qty.schedu...
O1021
& um & & größer als &, Überlieferung erlaubt
DEFINE &QS& = '<GL:quantity_schedule>quantity schedule</>'Was verursacht dieses Problem? &v1& Quantity excee...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.