Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here →
Message type: E = Error
Message class: O1 - IS-Oil : Message pool exchanges
Message number: 009
Message text: Summe & (&) über Belegpos.menge & &, bitte korrigieren (Neuaufbau ?)
The sum of all the scheduling lines exceeds the item qty.
The sum of the &V1& quantity must be less than or equal to the document
item qty. Serious error.
Reduce the &V1& quantities in one or more schedule lines.
Use "Restructure QS" function if possible (not yet called-off /
delivered / received).
If some quantities have already been called-off, you can use the
"Allocate quantities" function to allocate the surplus quantity. This
function reduces the &V1& quantity so that it is equal to the item
quantity.
You can select specific schedule lines before pressing the button
(allocate to selected schedule lines).
An option also exists, in which single schedule lines (allocation by
date entered) do not have to be selected.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
Get instant SAP help. Sign up for our Free Essentials Plan.
O1008 Pos. wurde auf aktuelle Periode gesetzt -> Rückwärtsblättern möglich
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
O1007 WEmenge um & & > über verfügb.M.: Überl.ungültig (& &)
DEFINE &QS& = 'quantity schedule'Was verursacht dieses Problem? <DS:GLOS.goods receipt>Goods receipt</> quantity ex...
O1010 Summe & um & unter Positionsmenge & &.
Was verursacht dieses Problem? Scheduling line total is less than the item qty. It is possible to have a lower &V1& than the item qty. (thi...
O1011 Im MP verfügbar: &, Pos. &, erf. Menge= & (&)
DEFINE &QS& = '<GL:quantity_schedule>quantity schedule</>'Was verursacht dieses Problem? <ZH>ERROR:</> D...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.