How To Fix O1009 - Summe & (&) über Belegpos.menge & &, bitte korrigieren (Neuaufbau ?)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 009

  • Message text: Summe & (&) über Belegpos.menge & &, bitte korrigieren (Neuaufbau ?)

  • Show details Hide details
  • Was verursacht dieses Problem?

    The sum of all the scheduling lines exceeds the item qty.

    Systemantwort

    The sum of the &V1& quantity must be less than or equal to the document
    item qty. Serious error.

    Wie behebe ich diesen Fehler?

    Reduce the &V1& quantities in one or more schedule lines.
    Use "Restructure QS" function if possible (not yet called-off /
    delivered / received).
    If some quantities have already been called-off, you can use the
    "Allocate quantities" function to allocate the surplus quantity. This
    function reduces the &V1& quantity so that it is equal to the item
    quantity.
    You can select specific schedule lines before pressing the button
    (allocate to selected schedule lines).
    An option also exists, in which single schedule lines (allocation by
    date entered) do not have to be selected.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler O1009 - Summe & (&) über Belegpos.menge & &, bitte korrigieren (Neuaufbau ?) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant