Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix O1009 - Summe & (&) über Belegpos.menge & &, bitte korrigieren (Neuaufbau ?)


O1009 - Overview

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 009

  • Message text: Summe & (&) über Belegpos.menge & &, bitte korrigieren (Neuaufbau ?)

  • Show details Hide details
  • Was verursacht dieses Problem?

    The sum of all the scheduling lines exceeds the item qty.

    Systemantwort

    The sum of the &V1& quantity must be less than or equal to the document
    item qty. Serious error.

    Wie behebe ich diesen Fehler?

    Reduce the &V1& quantities in one or more schedule lines.
    Use "Restructure QS" function if possible (not yet called-off /
    delivered / received).
    If some quantities have already been called-off, you can use the
    "Allocate quantities" function to allocate the surplus quantity. This
    function reduces the &V1& quantity so that it is equal to the item
    quantity.
    You can select specific schedule lines before pressing the button
    (allocate to selected schedule lines).
    An option also exists, in which single schedule lines (allocation by
    date entered) do not have to be selected.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


O1009 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author